Plumbing, Head, Part 7, Installation of Toilet, Seacocks, Manual Pump, Strainer, and Starboard Vent Valve

The toilet and other components of the new plumbing system, installed and ready for the hoses
Having accomplished many preliminary steps, I could now install the toilet and other components of the new plumbing system. How I did this on Oystercatcher, my Ericson 25, is the subject of this posting.
I wanted to install the toilet first, but I needed to do a few things before I could carry this out.
For one thing, I needed to check the mounting holes for the toilet. Back in 1975 when Ericson had manufactured this boat, they had installed a block of wood underneath the fiberglass shelf in the head. I knew there was wood under the shelf, because the original, coarse-threaded, square-headed wood screws that held the original toilet in place would have small grains of wood on them whenever I removed the screws from the platform (remember that I had reinstalled the old toilet a number of times in my replumbing of the head). The screws also made a distinctive squeaking sound whenever I turned them. I could only assume that this wood was teak, since it had held up this well for this long.
Nevertheless, I didn't want to give it any opportunities to begin to fail now. Therefore, I beveled the original holes with a countersink bit. My plan was to install the new toilet with butyl tape on the mounting legs. This tape would form a gasket of sorts around the screws when I tightened them down on the legs.
Long before this time I had installed the new bronze through-hulls and the mahogany backing plates and bronze flanges that supported the through-hulls. Now I could install the bronze seacocks. I started with the waste discharge through-hull. I wrapped Teflon tape around the threads of the flange, and then I screwed on the seacock. Notice that I removed the handle of the seacock prior to my installation of bronze valve.
If I had not been able to remove the handle, then I never would have been able to install the seacock. The mahogany bulkhead would have been an obstruction. I had thought through all of this in advance. I had also thought through the issue of the handle itself. This Groco brand seacock was designed to give the user some flexibility in terms of the positioning of the handle for the opening and closing of the seacock, where either pushing it away from you or pulling it toward you would open it. This was a good thing, especially for tight spaces.
There was, though, the issue of the orientation of the valve mechanism to which the handle was joined. In the pictures above and below, the valve mechanism is facing the bulkhead. I have not yet fully seated the seacock into position on the flange. I took this picture for illustrative purposes. If this were the fully seated position of the seacock, then there would be no way for you to install the handle, and there would be no way for you to use the seacock. Why? Because the bulkhead would be in the way. The valve mechanism needed to be facing the other direction in its fully seated position. How did I ensure that this would happen? Forethought. Back when I had installed the flange, I had fully dry-fitted the seacock to ensure that the flange itself was oriented correctly.This was the only way that I could have figured this out in advance.
One other thing . . . notice that on top of the seacock I have installed a bronze tailpiece with Teflon tape. I had purchased a straight tailpiece (as opposed to a right-angle one) because I had determined that this one would provide the fairer lead for the hose.
After I had installed this seacock, I moved on to the other one - the one that would supply seawater for the flushing of the toilet. For some reason I did not take any pictures of my installation of it. The picture, below, however, from an earlier stage in this project, gives you some idea of what I had to work with. Notice that the tailpiece for this seacock is right-angled. I had determined in advance that this would provide the fairer lead for the hose that would join it than would a straight tailpiece. Because of this right-angle piece, the installation of this seacock required even more forethought than than the previous one. Not only did I have to take into account the angle of the handle, but also the angle of this tailpiece. I have a better picture of the final installation later in this posting.
Now I could focus on the toilet. This Raritan PH II came out of the box preassembled, for the most part. It too had a right-angle piece that I had to take into consideration. Below, we see that this plastic tailpiece is oriented downward. I needed to turn it around so that it worked for my set-up. I can't imagine how the downward orientation would work for anyone's set-up, but I guess that's beside the point.
My re-orientation of the tailpiece enabled me to get a glimpse of that all-important joker-valve. This is that part of the toilet that gets so much discussion on all those online forums. Everything that you put into that toilet has to go through that narrow slit. The joker valve is the gatekeeper - an easily disgruntled one, I might add, who'll walk off the job at a moment's notice, if you don't respect him. Speaking of job positions, have you every heard of this one - Joker Valve Specialist? That's the position you fill when the gatekeeper quits.
Ah, yes, so funny to imagine the Joker Valve Specialist at work. It's not so funny, though, when you're the first one called upon to fill that position . . . because of your own dumb mistake. Forethought . . . oh, how I elevated that virtue to the stars. Now the tables would be turned. Why didn't I read more on those online forums about the tightening of the plastic flange? I should have. I instinctively dogged down the nuts on this flange. We'll discuss the consequences of my actions in the final posting of this article.
I mentioned that I would install this toilet with butyl tape, right? Well, here it is.
Before I set the toilet into place, I needed to install the toilet seat lid.
Raritan Engineering in Millville, New Jersey might have made the porcelain toilet, but they didn't make the toilet seat lid. That honor goes to Bemis Manufacturing in Sheboygan Falls, Wisconsin.
This was the Raritan PH II, Marine Style (not the Household Style, which was too big for the space). I had purchased this toilet from West Marine, back when they did real price-matching, not like the price-matching they do now in 2016 where they have a million different restrictions. They matched the price that Defender was offering during their annual spring sales event. That made it worth my while to buy it locally from the normally high-priced West Marine. Ever since they changed their price-matching policy, I've given most of my business to Defender and depended upon West Marine for little, last-minute things. This just makes the most economic sense to me, the consumer.
This Bemis lid joined the Raritan bowl in the same fashion that household lids join household bowls. It was an easy installation.
The hose that you see pictured above and blow was preinstalled. This was for the seawater that would provide the flushing action for the bowl.
See the pump housing on the right? By working the pump up and down by hand you draw seawater up through the seacock, up through the anti-siphon loop, down through the seawater strainer, and then down into the manual pump.
Speaking of seawater strainers . . . now it was time for me to install mine in the head. The Groco brand plastic strainer came with an aluminum mounting rack, but it did not come with any fittings. I had purchased the black Marelon right-angle fittings separately.
For the time being, I installed the fittings loosely, with a downward orientation. Later, when I installed the hoses, I would orient them correctly. The correctness of anyone's orientation depends upon his set-up. For mine, one would point upwards, the other down.
Now let's take a look at the orientation of the seawater seacock handle and the right-angle tailpiece. Everything turned out as I had planned when I installed the flange long before this time. When I fully screwed the seacock into position on the flange, the valve mechanism ended up adjacent to the fiberglass bulkhead. This allowed me to install the handle as you see pictured. To me, this was the most natural position for the handle. The user of the toilet could reach down beside him and push the handle downward to open the seacock. Then, he could reach down and pull the handle upward to close it. As far as the orientation of the tailpiece was concerned, it too ended up being close to what I had planned. This one was more difficult to plan in advance. As I recall, I wrapped the threads several different times to different thicknesses to get the tailpiece to end up where I wanted it to be.
Below, we see a picture of the waste outlet seacock as it appeared after I had installed the toilet. There was just enough room for the handle. Note that the tailpiece for the head is now oriented 45 degrees to the left. Yes, this orientation is possible on the Raritan PH II tailpiece. This ended up being necessary, not only for the sake of the hose that I would soon install, but also because I needed the room for the seacock handle. Yes, the handle was oriented, for the most part, where I had planned in advance for it to be, but it was not exactly where I had wanted it. I had wanted it to be in the the 10 o'clock position, not the 7 o'clock. As it turned out, the 10 o'clock was actually better for the reason I just described. Just as is the case when sailing, the ability to adapt to changing conditions is a must.
The last thing I needed to do for this part of the project was to install the holding tank vent valve on the hull of the head. I used flat head screws in counter-sunk holes so that the heads of the screws would not interfere with anything.
Now I needed to install all the hoses that I had previously pre-cut for this new plumbing system. That's the subject of my next posting. That part of the project, just like this one, would require some adaptation to changing, real-world conditions.
This ends this posting on how I installed the toilet and other components of the new head for Oystercatcher, my Ericson 25.

Plumbing, Head, Part 4, Construction of Panels for Manual Pump, Strainer, and Vent Valve

The epoxy-coated panels for the manual pump, the strainer, and the vent valve
Having installed the stainless steel through-hulls for the holding tank vents on Oystercatcher, my Ericson 25, my next task was to construct the panels for the manual holding tank pump, the seawater strainer, and the starboard holding tank vent valve. All three of these items would be located on the hull, or I should say the hull-liner of the boat. It would be impractical and foolhardy to screw these items into the fiberglass hull liner with wood screws. The hull liner was thin, and it was close to the fiberglass hull. The tips of the screws would either penetrate the hull or they would chafe the hull such that they would threaten its integrity. Therefore, I had no choice but to construct plywood panels that would serve as mounting surfaces for these items. The panels themselves would be joined to the hull liner with hardware that was epoxied in place. In this posting, I focus on my construction of these panels and my installation of the hardware to support them.
As I said, I needed to mount a Whale brand manual pump to the hull liner.
In the picture below, you see that I have temporarily screwed the pump to the hull liner, simply for the sake of helping me figure out where to route the hoses. I discussed all of this in my first posting in this series.
Why did I need to mount this manual pump here? Why not mount it somewhere else, you might ask? Believe me, I thought through many different scenarios before deciding upon this one. The forward bulkhead to the left in the pictures above and below was out of the question. There's no way that I could have routed a hose to it from the holding tank. This meant that the only alternative was the aft bulkhead. This could have worked, but it would have put the pump in a position that was not user-friendly. The person using the pump would not be able to draw the handle back and forth, toward him and away from him. I had used the exact type of pump many times on different tall ships, and I knew that it needed to be in this user-friendly, hull-mounted position.
In terms of the seawater strainer/filter, I had purchased a Groco brand strainer. It came with an aluminum mounting bracket that allowed the strainer to hang free of the hull.
I planned to install the bracket in the area indicated by the oval in the picture below. Again, I should note that I considered various alternatives before settling on this hull-mounted position.
In the hanging locker on the port side of the boat, I had installed a valve for the port side holding tank vent. At the time, I thought that this valve would not need a mounting panel. As we shall see in a later posting, I was wrong.
On the starboard side of the boat, I also planned to install a valve - this one for the starboard holding tank vent. This valve would need to be located on the hull. There was no way around it given the orientation of the hoses that would join it.
The most challenging panel to construct by far was the one for the manual pump. It needed to be big enough to distribute the load that the pumping action would impose on it; it needed to be thin enough to conform to the curvature of the hull; and at the same time it needed to be thick enough for mounting the pump housing to it. After much contemplation, I decided to construct the panel of two different pieces of 3/8 inch exterior grade plywood. The smaller piece would reinforce the larger one at the lower end, where it was most needed. The large, unreinforced piece would be thin enough and long enough to conform to the curvature of the hull.
I wanted the corners of the panel to be rounded, so I used one of the old bronze through-hulls to scribe the appropriate arcs.
Always seeking to wed the practical with the aesthetically pleasing, I decided to make the panel for the seawater strainer of a similar size and appearance to the reinforced portion of the manual pump panel.
I also contemplated an arrangement that would give the two adjacent panels a more pleasing appearance.
In terms of the manual pump panel, I decided that a good way to give some curvature to it would be to weigh it down with dumbbells and let it sit in a bridged position for some length of time.

Meanwhile, I focused on the size and position of the vent valve panel relative to the seawater strainer panel.
After a sufficient length of time had passed, I epoxy-coated the panels.
Each one got two coats of epoxy.

I allowed the epoxy to cure, and then I sanded each piece.
My plan was to paint these panels with two part polyurethane paint, so I needed their surfaces to be smooth but textured to receive the paint.
As far as the mounting of the manual pump panel was concerned, my plan was to use perforated base studs. I had ordered these 1/4 studs from McMaster-Carr in Atlanta, Georgia. These studs were 316 stainless steel and the company that manufactured them was named Rotaloc.
My first task was to figure out where to install the six studs that would secure the panel to the hull liner. The two sets of studs above and below the manual pump could not interfere with the two sets of mounting legs for the pump. These mounting legs would be very close to the studs, so it was important for me to be precise.
I used the long panel as a template of sorts to figure out the measurements.
I also used the long panel as a template for marking the hull liner. Before I took the panel to the boat, I drilled pilot holes through the six marks where I planned to install the six studs.
I then marked the hull through these pilot holes and drew reference lines.

I used the reference lines for the manual pump panel to determine where to draw the reference lines for the seawater strainer panel.
Then, in turn, I used this second set of reference lines to draw the reference lines for the vent valve panel.
Afterward, I returned to the manual pump reference lines and made more detailed marks.
At last, I knew exactly where I needed to mount the perforated base studs.
Now I needed to sand away the gelcoat, so the studs would have a clean fiberglass foundation onto which the epoxy could bond.
As I said, these studs were manufactured by Rotaloc.
I used my Rockwell Sonicrafter to sand away the gelcoat in the six spots.
The acetone removed the dust and revealed a nice, clean surface for the studs.
After I was finished, I re-marked the center of each circle to create a reference for the mounting of the studs.

Some of the studs were longer than they needed to be, so I cut them down to size in advance.
Yes, a Dremel with a reinforced cutting wheel will cut through a 1/4 inch 316 stainless screw, but it takes some patience. On another project on the boat I had burned up a Dremel trying to do this too quickly.

To secure the studs to the hull liner I used Devcon 5 minute epoxy.
I'll say right now that this product does not always live up to its advertised PSI strength.
In my experience with this project (and another project on this boat), you cannot tighten down the nuts too much on these studs, if you have glued them to wood, and yes, I was meticulous in my following of the instructions for the application of this product.
Maine Sail, that well known writer on the various sailing forums, had sung songs of high praise for Weld Mount - an epoxy product that actually stands up to a lot of abuse. I considered purchasing Weld Mount from Jamestown Distributors in Rhode Island, but I decided that it was prohibitively expensive for someone like me who only needed it for a few studs. It certainly made sense for someone like him, being the marine professional that he was, and if I had to mount things on the hulls of boats all the time like he does, then I would have made the investment.
I would install six of these studs on the hull liner with the Devcon epoxy. Interestingly, not a one of the bonds for these studs failed, not even the ones for the two studs at the middle - the ones that received the most abuse in terms of the torque I put on the nuts. It was, as we shall see, the bond on the wood for one of the legs of the pump that failed.
Now back to our subject. Below you'll notice that the stud on the right is not perfectly aligned with my reference marks.
Despite my best efforts to center the studs on the marks, some of them were slightly off. Therefore, I had to drill out the holes in the panel to a larger diameter.

I gradually increased the size of the holes until they were all 1/2 inch in diameter.
At last I was able to fit the panel on the studs.
Then I began to tighten down the nuts. The studs in the middle held up to my tightening down of the nuts, even though this was the area in which there was considerable stress due to the curvature of the hull. Yes, the panel itself was bowed, but it was not bowed as much as the hull.
Back at the work table, I used a pen to mark the holes I needed to drill in the small reinforcement piece.

These holes, of course, were for the studs on the hull.
Afterward, I drilled holes in the small piece of wood for the pump's mounting legs. Then I used these holes to mark the large piece of wood.
On these marks I placed the studs for the legs of the pump.

Then I whipped up another batch of the Devcon 5 minute epoxy.

It was the bond for the top left stud that would eventually fail when the time came for me to tighten down the nuts.
Onto these studs I placed the small piece of wood - but only after I had enlarged the holes so that the piece could fit. These studs, like those on the hull, had shifted slightly during the glue-up.
As a result, I had trouble mounting the legs of the pump on the studs.
I had to enlarge some of the holes with my drill in order to achieve a proper fit.
In the boat, I installed the entire pump and panel assembly. I thought it looked good. Everything seemed to be coming together well. The assembly was solid, and the hull liner did not flex or bow when I pulled the handle of the pump back and forth.
This convinced me that my choice to mount the pump in this location was a good one.
My sentiment about this was only strengthened when I temporarily reinstalled the old toilet and saw that there was plenty of room for the lid of the toilet to swing backward. The position of the lid also confirmed that my choice for the location of the other two panels that I would soon install was also a good one. From a visual perspective, the seawater strainer and the vent valve would be easy to see and inspect, even with the lid up.
Now I could focus on the mounting of the studs for the seawater strainer . . .
. . . and the holding tank vent valve.
I double-checked my marks.
Then I got to work with the Rockwell Sonicrafter.
Now it was time to clean up the area and glue the studs into place.

This time I used Ace brand epoxy, which, if I recall correctly, had a higher PSI rating than the Devcon.
It had the same blue and white appearance as the Devcon.
The disappearance of the blue indicates that you've mixed the two ingredients together thoroughly.

It took several batches.

I had to widen some of the holes with the drill, but soon both panels were in place.
To disguise the holes, I used fender washers underneath the nuts.
Now I could start to snug down all the nuts.
All was going well until I snugged down the nut for the top left leg of the pump. All of a sudden I heard a pop, and I realized that the bond had failed. In the picture above and below you see a yellow circle. I should have placed the circle a little lower. It wasn't the stud at the center of the circle, but the one just beneath it.
I removed the panel-pump assembly from the hull and took it back to my work room. There, I disassembled it and inspected the studs. It was obvious that these studs with this Devcon epoxy would not bond well to wood, even if it had been fully epoxy-coated and sanded.
With a chisel and a dead blow hammer I removed the other studs.


My remedy for the problem was to drill holes and install the studs on the backside of the large panel.
You might ask how I planned to secure these studs to the backside of the panel.
I had no choice but to secure them to the back of the panel with epoxy soaked cloth. More on this later.
More important to me at the moment were the studs on the hull of the boat. These had never failed, but I did worry about the two studs at the center of the pump panel. These were the ones that had to bear the bulk of the load whenever I worked the handle of the pump back and forth. These were also the ones that pulled the panel inward in an arc that corresponded to the curvature of the hull. This arc or bow was one of the things that gave this panel its strength.
I decided that it would be smart to reinforce these studs with epoxy soaked cloth to ensure that they never broke free from the hull. Therefore, I broke out the quarter sheet sander and removed much of the gelcoat around these studs.
I also figured that this cloth would give additional strength to the hull liner and thus further reduce the chances that the liner would flex when I employed the manual pump.
As you can see in the picture above, this sanding of the gelcoat created an incredible amount of dust.

I cleaned up the work area with xylene, and then I broke out the 12 ounce biaxial cloth.
I cut three pieces of biax to the appropriate size.
Before I laid up the cloth, I wet-out the bare fiberglass with neat epoxy. I used RAKA 127 resin and 350 non-blush hardener.
Then I laid up each layer of cloth, one layer at a time, soaking each layer of the biax with neat epoxy before laying up the next.

Since I was doing this work on a vertical surface much of the neat epoxy ran down the hull liner. The plastic helped to block any drips from my brush, but not those drips on the hull. I had to monitor the work area for almost an hour to clean up all the drips with acetone before the epoxy hardened and clean-up became impossible.
I was satisfied with my work for the moment, and decided to move on to other things.
Specficially, I moved on to the securing of the studs to the back of the panel with cloth.
Yes, it was ugly, but it did the job, and no one would ever see it.
A day or two later I dry-fit the pump onto the studs.
Some of the epoxy from the backside had crept through the holes. I had to remove this epoxy before I could obtain a good fit.
Now that I had mounted the studs to the backside of the large panel, there was no reason for me not to glue the small panel to the large one with epoxy.
For this, I called upon my old friend named RAKA.
First I wet-out the pieces.
Then I thickened-up the neat epoxy with colloidal silica.
I used clamps to ensure a good bond, especially since these panels were, by design, slightly bowed.
Afterward, I used the leftover epoxy to create a fillet around the joint.
A day or two later I used my sanders to smooth out all the cured epoxy.
The Dremel was a big help in cleaning up the rough edges of the fillet.

Sanding the cured epoxy in the boat was not fun. The biaxial cloth was like concrete. The dust would have been unbearable without my respirator, mask, gloves, and long-sleeved shirt.
There was no way in hell those studs would ever come off that hull liner.
Afterward, I added a few finishing touches to the panels.
I could have stopped here, but why not make these panels look like they truly belonged to this beautiful boat? That's what I thought. Therefore, I broke out the Pitthane two-part polyurethane and got to work.
I've spoken many times about this paint, so if you'd like to read more about it, just click on the word Pitthane in the Labels sidebar.
I applied the first coat to each panel.

The next day I lightly sanded the panels with 100 grit paper to remove the imperfections and give the surface some "tooth," as they say.

Afterward, I used the thinner to remove the sanding dust.
This thinner is essential, not necessarily for this task but for the thinning of the paint. Without it, the paint will not lie down.
I always use a new tray and roller for each batch, whenever I use this Pitthane. I also always wear my respirator and heavy duty nitrile goves. This stuff packs a punch. Thin blue nitrile gloves dissolve quickly when they come into contact with the thinner.
The second coat of Pitthane brought this lengthy project to its conclusion.

This ends this posting on my construction of the panels for the holding tank manual pump, the seawater strainer, and the holding tank vent valve for Oystercatcher, my Ericson 25.